    GOBARdhan — Component-wise Operational Guidelines for the Compressed Biogas Sector, 2026

    • Support eligible compressed-biogas projects through six distinct components.
    • Plant grants, gas-sale revenue, pipeline assistance and lender guarantees are different instruments and must not be added as one subsidy.

    Illustrated industrial district · not an actual site map

    Current application status

    Guidelines published · activation unverified
    • The Ministry publishes the 15 September 2026 component-wise guidelines.
    • This confirms publication, not that every component accepts applications.
    • Confirm portal activation and credit-guarantee commencement with the responsible agency
    • calculator caveats remain.
    Open official scheme website

    Application notice checked: 2026-11-23 · Not a verification of every calculator rule or an approval.

    Key facts

    Scheme
    GOBARdhan — Component-wise Operational Guidelines for the Compressed Biogas Sector, 2026
    Issuing authority
    Ministry of Petroleum and Natural Gas
    Who is eligible
    Energy & Sustainability. Applicant, investment, location and activity conditions in the guideline still apply.
    Main incentives
    Plant assistance: 1.25/TPD; brownfield half; special20% uplift; own upgrade0.60/TPD cap5 (GOBARdhan III §§2.4,4.1–4.4, PDF pp.22–25). Machinery reimbursement: 50% lesser actual/norm and0.75/TPD, deduct BAM, remaining combined headroom; no brownfield (GOBARdhan III §§5.1–5.8, PDF pp.30–31). Plant performance releases: 25:25:50; final pro-rata between50–75% PLF (GOBARdhan III §4.5, PDF pp.25–26).
    Application window
    Guidelines published · activation unverified. The Ministry publishes the 15 September 2026 component-wise guidelines. This confirms publication, not that every component accepts applications. Confirm portal activation and credit-guarantee commencement with the responsible agency; calculator caveats remain.
    Last verified
    2026-11-14 · reviewed rules only; publication and indicative exceptions remain
    Official source / repository verification
    01

    The policy at a glance

    Start with who is covered, what is supported and which dates need verification.

    Sector coverage

    Energy & Sustainability

    Support instrument

    Capacity-linked plant assistance plus eligible machinery reimbursement; aggregate capital-assistance ceiling ₹30 Crore per project

    Policy period / window

    31 December 2030 for plant capital-assistance and CGD pipeline applications (uploaded guidelines)

    Responsible authority

    Centre for High Technology (CHT), Ministry of Petroleum and Natural Gas

    Source & verification status

    • Uploaded Office Memorandum dated 15 September 2026, F.
    • No.
    • L-16022/9/2025-GP-I-Part(1).
    • Official Ministry publication independently confirmed 23 November 2026
    • component portal activation and NCGTC commencement remain unverified.
    • Calculator-rule caveats remain.

    Frequently asked questions

    What is GOBARdhan — Component-wise Operational Guidelines for the Compressed Biogas Sector, 2026?

    Support eligible compressed-biogas projects through six distinct components. Plant grants, gas-sale revenue, pipeline assistance and lender guarantees are different instruments and must not be added as one subsidy. Issuing authority: Ministry of Petroleum and Natural Gas. See guideline; final notified rules prevail.

    Who can apply for GOBARdhan Compressed Biogas?

    Energy & Sustainability. Applicant, investment, location and activity conditions in the guideline still apply.

    What incentives are available under GOBARdhan Compressed Biogas?

    Plant assistance: 1.25/TPD; brownfield half; special20% uplift; own upgrade0.60/TPD cap5 (GOBARdhan III §§2.4,4.1–4.4, PDF pp.22–25). Machinery reimbursement: 50% lesser actual/norm and0.75/TPD, deduct BAM, remaining combined headroom; no brownfield (GOBARdhan III §§5.1–5.8, PDF pp.30–31). Plant performance releases: 25:25:50; final pro-rata between50–75% PLF (GOBARdhan III §4.5, PDF pp.25–26).

    What is the last date to apply for GOBARdhan Compressed Biogas?

    Guidelines published · activation unverified. The Ministry publishes the 15 September 2026 component-wise guidelines. This confirms publication, not that every component accepts applications. Confirm portal activation and credit-guarantee commencement with the responsible agency; calculator caveats remain.

    Where is the official source for GOBARdhan Compressed Biogas?

    Responsible authority: Ministry of Petroleum and Natural Gas. Read the guideline and source-status notes in the repository before applying.

    Is the GOBARdhan Compressed Biogas calculator a guaranteed payout?

    No. Estimates and component ceilings are not sanctions or approved payouts. Source review: 2026-11-14, reviewed rules only; indicative exceptions and publication warnings remain.

    Full forms and incentive glossary

    Last verified against source: 2026-11-14 · reviewed rules only; exceptions below · Includes indicative items; see calculation basis.

    Benefits at a glance

    Rate / basis

    • 50% eligible Lakh cost

    Component cap

    • 0.75 Crore/TPD
    • combined30

    Tenure / window

    • 31 December 2030 for plant capital-assistance and CGD pipeline applications (uploaded guidelines)

    Eligible activity

    • Energy & Sustainability
    Machinery reimbursement · GOBARdhan III §§5.1–5.8, PDF pp.30–31 · Verified

    Component-specific limits; not an overall entitlement or approval. Phase 3 caveats remain applicable.

    02

    How the support works

    Separate the calculation basis, the policy limit and the evidence needed for payment.

    01

    Identify the applicant

    Check Energy & Sustainability against the policy’s actual eligible activities.
    02

    Identify the support basis

    Capacity-linked plant assistance plus eligible machinery reimbursement; aggregate capital-assistance ceiling ₹30 Crore per project
    03

    Keep qualifying evidence

    Use the scheme-specific documents below; do not substitute total project cost for an eligible base.
    04

    Approval before payment

    Sanction, verification and scheme-specific release conditions apply. Passing a calculator check is not approval.
    01

    I. CBG Offtake Assurance Mechanism

    Scope

    • Up to 100% of available CBG at the producer’s option, subject to technical and operational feasibility, mapping and firm contracts
    • not unconditional purchase.

    Conditions

    • Registered commissioned or under-construction plant
    • applicable PNGRB specifications and IS 16087:2025
    • SCADA, online gas-quality measurement and automatic shut-off.

    CBG obligation

    • 3% in FY 2026-27
    • 4% in FY 2027-28
    • 5% from FY 2028-29, subject to amendments.
    02

    II. CBG Pricing Framework

    Initial administered price

    • ₹2,110/MMBTU (approximately ₹98/kg at 95% methane), excluding taxes and compression.
    • Paid on custody-transfer measurements
    • PPAC revisions prevail.

    Not an additional producer subsidy

    • Affordability support up to ₹10/kg goes to the Synchro Operator, not a separate producer payout.
    • Do not add it to the administered price.

    Start and reporting

    • After approval, the next 15-day billing cycle
    • quarterly CA-certified feedstock and by-product sales/utilisation statements.
    • Third-party raw-gas-only upgrading is excluded.
    03

    III. Capital Assistance

    Greenfield / brownfield

    • ₹1.25 Crore/TPD for new greenfield capacity
    • 50% of applicable rate for incremental brownfield capacity.
    • Special-category areas: 20% uplift.
    • First commercial sale after notification, new machinery and monitoring compliance required.

    Own biogas plant upgrade

    • ₹0.60 Crore/TPD, capped at ₹5 Crore.
    • No assumed special-area uplift on this separate rate.

    Machinery

    • 50% of eligible procurement cost, appraised against lower of submitted cost and portal norms, capped at ₹0.75 Crore/TPD
    • net of prior BAM sanction.
    • Brownfield projects excluded from this sub-component.

    Limits and exclusions

    • Combined plant and machinery aid capped at ₹30 Crore/project
    • entity plus majority-owned subsidiaries ₹500 Crore/FY.
    • At least 50% municipal/sewage waste, predominantly liquid/gaseous feedstocks, third-party gas-only upgrading and other Central establishment support excluded.

    Plant releases

    • 25% after CTE/PESO and 48-month bank guarantee
    • 25% at first sale with 24-month guarantee
    • final 50% based on performance.
    • ≥75% PLF gives full final tranche
    • 50–75% pro-rata using (PLF−50)/25
    • below 50% gives zero and guarantees may be encashed.
    04

    IV. Pipeline Infrastructure

    CGD network

    • At least 2 TPD plant capacity
    • under-construction projects need ≥25% progress and firm offtake.
    • Assistance: lower of 50% eligible actual cost and ₹0.50 Crore/km steel or ₹0.075 Crore/km MDPE
    • maximum 75 km.
    • Mixed segments calculated separately.

    Beneficiary and releases

    • CGD entity normally
    • producer only with CGD consent.
    • Optional 10% mobilisation, then 40% at 50% construction (50% if no initial advance), final balance at commissioning and ≥50% committed quantity evacuated for ≥1 month.

    Trunk pipeline clusters

    • GAIL is cluster operator, not a direct company subsidy.
    • At least two plants, each ≥2 TPD, preferably aggregate ≥20 TPD.
    • Effective length includes exclusive line plus equal plant shares of shared lines, capped at 75 km per plant
    • commissioning within two years of sanction.
    05

    V. Credit Guarantee

    Coverage

    • 85% of eligible loan, guarantee cap ₹20 Crore general MSME / ₹25 Crore women-led MSME.
    • This protects the lender
    • it is neither a grant nor forgiveness of borrower debt.

    Eligibility and timing

    • Registered greenfield MSME projects and eligible lenders only
    • excludes acquisitions, standalone upgrading, expansion and ≥50% municipal/sewage waste.
    • Commencement depends on NCGTC issue date (not independently verified).

    Loan and fee

    • Loan up to 15 years including 18-month moratorium
    • annual guarantee fee 0.5%.
    • Scheme ends 31 December 2030 or cumulative ₹15,000 Crore loans, whichever first.
    06

    VI. CBG Ecosystem Challenge Fund

    District challenge

    • District Collector/Magistrate submits.
    • Top three districts: ₹5 Crore each
    • remaining top-ten districts: ₹2 Crore each, subject to verified rankings and permitted use.

    Ecosystem enablement

    • CBG developers, recognised research/academic institutions, start-ups and CPSEs
    • ordinarily up to 50% eligible project cost as grant.
    • Higher support requires exceptional PAB approval
    • no duplicate Central support for the same work.

    Application and release

    • Only against PMA Request for Selection with its own deadline and assessment
    • milestones, utilisation records and payment schedule follow the executed agreement.
    • No universal instalment split.
    03

    West Bengal: industry & location atlas

    Industrial context is separate from eligibility under the policy.

    Invest India profile reviewed 12 November 2026Read state source

    Kolkata & Haldia gateways

    Industry presence

    IT and analytics; maritime trade and export-oriented production.

    Logistics & market access

    Kolkata and Haldia ports; Kolkata airport; Haldia–Farakka National Waterway 1.

    Sourcing checks

    Compare port handling, container frequency, customs support, packaging suppliers and final-mile trucking.

    North Bengal access

    Industry presence

    Tea and agro-based value chains; opportunity screening, not a notified incentive zone.

    Logistics & market access

    Bagdogra airport links northern West Bengal to domestic and international destinations.

    Sourcing checks

    Validate crop seasonality, collection radius, cold-chain reliability and sample quality before procurement.

    Similar industries & potential partners

    Invest India lists IBM, TCS and Cognizant in the state technology ecosystem; its opportunity pages cover agriculture, textiles and leather.

    State-level presence does not verify a specific factory, supplier, product, vacant plot or current commissioning status. Sourcing checks are our due-diligence prompts, not official vendor endorsements.

    NICDC land platform
    01

    Shortlist a location

    Match the product, customer market and industrial land use.
    02

    Validate utilities

    Get written power, water and effluent-treatment availability.
    03

    Compare delivered costs

    Use actual freight, storage, sourcing and labour quotations.
    04

    Check eligibility

    Confirm the notified policy zone separately from the industrial location.
    View weekly NICDC source snapshot
    04

    Environmental clearance: which category applies?

    A policy name or state does not determine EC. The process, capacity, site and current notifications do.

    Category A

    Central appraisal route

    Scheduled projects meeting Category A criteria are appraised through the central environmental-clearance route. Check the current Schedule and applicable location conditions.

    Category B1

    State-level route with EIA

    Category B projects classified as B1 normally require an Environmental Impact Assessment report and public consultation where applicable. Confirm the competent authority and current exemptions.

    Category B2

    Screening still required

    B2 treatment may dispense with an EIA report under applicable provisions. It does not automatically remove environmental clearance, consent, waste or land-use obligations.

    How to screen your industry

    Bulk drugs and synthetic organic chemicals, metallurgy, cement, leather processing and industrial estates have specific Schedule entries. A formulation unit, office or device-assembly plant cannot simply inherit the category of a bulk-chemical plant. Check ancillary boilers, waste treatment, construction and expansion too.

    EC is not pollution-consent colour

    Red, Orange, Green and White pollution classifications are a different framework from EC A/B1/B2. Ask the State Pollution Control Board about Consent to Establish, Consent to Operate and waste authorisations independently. No project-specific category is assigned here.

    01

    Define the process

    Product, inputs, reactions, output capacity and expansion scope.
    02

    Match the Schedule

    Identify the applicable EIA entry and latest amendments.
    03

    Check the site

    Assess sensitive areas, land status and applicable general conditions.
    04

    Obtain a determination

    Confirm the route with the competent authority before construction.

    Framework references include the original 2006 notification and 2013 screening guidance, not a consolidated current-law determination. Later amendments prevail. PARIVESH content could not be retrieved during this review; its live service availability is unverified.

    05

    Documents, where to apply and when

    Follow the evidence from project preparation to an approved claim.

    01

    Register and prepare

    Prepare this evidence
    • Plant ID, DPR, capacity/feedstock evidence, CTE/PESO, financing closure and no-other-Central-support certification
    Submit / verify here
    • GOBARdhan portal / CHT (confirm component activation)
    When to act
    • Plant capital-assistance applications by 31 December 2030
    • PMA scrutiny within 30 days from submission month-end
    • clarifications within 15 days

    Component III, 4.6.1–4.6.5

    02

    First plant release · 25%

    Prepare this evidence
    • In-principle approval, CTE/PESO and equivalent bank guarantee valid 48 months
    Submit / verify here
    • PMA → MoPNG → CNA
    • developer or loan account as applicable
    When to act
    • After approval and verification
    • CNA releases within two weeks of receiving funds, not two weeks from application

    III, 4.5; 4.6.12–4.6.14; 6

    03

    First sale · next 25%

    Prepare this evidence
    • Appendix I first-sale report, invoice, CTO/PESO, financing and equivalent 24-month guarantee
    • SCADA records
    Submit / verify here
    • GOBARdhan portal / PMA
    When to act
    • First-sale report within 18 months of in-principle approval
    • justified extension request at least 30 days before deadline

    III, 4.6.15–4.6.22

    04

    Performance · final 50%

    Prepare this evidence
    • Three consecutive months operations, 24-hour PLF test, SCADA production and joint sales tickets
    Submit / verify here
    • PMA verification / possible site visit
    When to act
    • Milestone within 18 months of first-sale report.
    • ≥75% PLF: full final tranche
    • 50–75%: pro-rata
    • below 50%: none and BG encashment risk

    III, 4.5; 4.6.23–4.6.29

    05

    Machinery reimbursement

    Prepare this evidence
    • CTO/PESO, Appendix V machinery list, Appendix VI BAM declaration, invoices, payments and serial-number photographs
    Submit / verify here
    • PMA / GOBARdhan portal
    When to act
    • Claim within 24 months of machinery approval
    • once only
    • no machinery aid for brownfield

    III, 5.4–5.9.11

    06

    CGD pipeline application

    Prepare this evidence
    • Plant ID, feasibility report, route, contractor costs, offtake contract, permits declaration and CGD NOC if producer-led
    Submit / verify here
    • GOBARdhan portal / CGD entity / CHT
    When to act
    • Apply by 31 December 2030
    • complete scrutiny 30 days, PAB approval within 2 months
    • commissioning within 18 months of approval

    IV, 4.2–4.4

    07

    Guarantee / ecosystem proposals

    Prepare this evidence
    • MSME and lender evidence for guarantee
    • proposal, costs, deliverables and milestone plan for ecosystem selection
    Submit / verify here
    • Eligible lender / NCGTC
    • PMA Request for Selection for ecosystem
    When to act
    • Guarantee commencement depends on NCGTC issue notice
    • ecosystem deadline and releases follow individual selection and agreement

    V, 3–11; VI, 5.5–5.6

    Times run from the specified event and depend on complete evidence. Processing targets are not guaranteed approval or payment dates.

    06

    Your application route

    01

    Stage 1

    Register plant and confirm component availability with CHT.
    02

    Stage 2

    Submit component-specific application and approvals; plant/CGD application deadline in upload is 31 December 2030.
    03

    Stage 3

    Respond to PMA clarifications within 15 days; PAC appraisal and PAB sanction required.
    04

    Stage 4

    Claim only the sanctioned component on verified implementation and performance milestones.
    05

    Stage 5

    For debt-financed plant projects, assistance is credited to the loan account up to loan drawn; any surplus to developer account. Self-financed projects receive developer-account payment.
    Open official application portal

    Bharat Incentive is an independent information platform. Applications and approvals are handled by the responsible authority.

    07

    Your preparation file

    Keep evidence for the exact activity, applicant and claim component.

    GOBARdhan Plant ID and entity details

    DPR (Appendix II), capacity and feedstock breakdown

    CTE from SPCB/PCC or relevant PESO approval; CTO for applicable claims

    Loan sanction/financial closure or self-financing certification (Appendix III)

    No other Central establishment subsidy certification (Appendix IV)

    Credit-guarantee declaration and JanSamarth evidence where applicable

    SCADA, online gas chromatograph/mass spectrometer and shut-off geo-tagged evidence

    First-sale report and invoice (Appendix I)

    48-month / 24-month bank guarantees for applicable early plant releases

    Eligible machinery list (Appendix V), BAM declaration (Appendix VI), invoices, payments and serial-number photos

    Three-month operations, SCADA and joint-ticketing performance evidence

    Pipeline feasibility, route map, contractor estimates, offtake contract and CGD consent where applicable

    Policy source document

    All official policy documents

    Bharat Incentive Platform is not a Government website. Information and estimates use public policy documents, guidelines and uploaded official-source materials. Uploaded documents and independently unverified publication or application windows are identified where known.

    This platform does not issue any approvals, certificates, or guarantees regarding incentive claims. Users are advised to verify all information with the competent Government authority before making investment decisions.

    Bharat Incentive

    Government incentive advisory and public-source policy intelligence for manufacturers, investors and industry teams.

    Independent platform; not affiliated with any government department. Information from official public sources; verify before applying. Uploaded source status and unverified notices are identified where known. Estimates are not approvals or guaranteed payouts.

    © 2026 Bharat Incentive. All rights reserved.